Skip to content

How long does post-construction cleaning take?

One day for an 80 m² flat, two to three days for a villa, five to ten days for a ten-unit building — depending on residue load. Cement film, plaster drops and adhesive stains are what stretch the schedule, since each surface needs mechanical scraping before washing. The sequence is always the same: debris removal, dry dusting, wet cleaning top-down, then glass and joinery last. The per-m² rate is stated in the quote after inspection. Photos before and after are sent on WhatsApp, and a final inspection with you (or your site manager) closes the job.

Related: Post-Construction Cleaning in Agadir

Other answers