Post-construction cleaning in Agadir: moving fast without cutting corners
A post-construction clean in Agadir is planned in two waves: first the heavy debris pass (plaster, cement, cutting residue), then the fine finish (dust on skirting, construction windows, marks on wood). On a standard 80–120 m² flat, the two waves fit in one day for 550–950 MAD; range to be confirmed with a real quote. Timing is the key factor: a site never finishes clean and on time — so we hold a slot within the mason's announced window and shift at no cost if handover slips 24 h.
nettoyage fin de chantier Agadir rapidenettoyage après travaux Agadir délainettoyage fin de chantier Agadir prixremise en état appartement après travaux Agadir
The two-wave method — why one pass fails
- Wave 1 (rough debris): vacuum on joinery and blocks, scraping fresh cement, clearing plaster leftovers. Skip it and tomorrow's cloth smears dust everywhere.
- Wave 2 (final clean): windows and glass doors (a paint fleck on every frame), skirting and ledges, bathrooms and kitchenette, marks on tile.
- New tile wants neutral cleaner: strong acid eats the grout on the first pass — what rushed 'site pros' get wrong.
Price and timing: when to say yes
- Flat 80–120 m², two waves: 550–950 MAD, same day if the mason delivers in the morning.
- Villa 200 m²+ over floors: 1,200–2,500 MAD, often on 2 days with high window work.
- Get the detail in writing: windows included or not, construction waste removal (usually the mason's), water access.
- Every range stays to be confirmed (real quote): site photos by WhatsApp are enough to price it.
| Case | Indicative range | Timing |
|---|---|---|
| Flat 80–120 m², two waves | 550–950 MAD | same day |
| Villa 200 m², 2 floors | 1,200–2,500 MAD | 1–2 days |
| High-window add-on | 150–400 MAD | next day if needed |
| Shift if handover slips | 0 MAD | free 24 h reschedule |
Our neighbourhoods in Agadir
Services
Post-ConstructionPost-construction1,200–3,000 MAD / jobFrequently asked questions
How long does post-construction cleaning take?
One day for an 80–120 m² flat in two waves; villa 1–2 days.
What if the site runs late?
Free 24 h reschedule when handover slips: we re-set the window with the mason.
How much does cleaning after works cost?
550–950 MAD for a standard flat (real quote to confirm); high windows are an add-on.
Related articles
- Nettoyage de villa à Agadir pas cher : fourchettes MAD et ce qui fait bouger le prix
- Femme de ménage à Agadir pas cher : 40–60 MAD/h, où se situe le vrai marché
- Nettoyage professionnel de café à Agadir : hotte, cuisine, salle — l'organisation qui tient l'année
- Contrat annuel de nettoyage de bureaux à Agadir : ce que le devis doit lister
- Nettoyage d'hôtel et de riad à Agadir : chambres, parties communes, fond de saison
- Nettoyage de location saisonnière à Agadir et Taghazout : la rotation en 2–4 h