A post-construction clean in Agadir is planned in two waves: first the heavy debris pass (plaster, cement, cutting residue), then the fine finish (dust on skirting, construction windows, marks on wood). On a standard 80–120 m² flat, the two waves fit in one day for 550–950 MAD; range to be confirmed with a real quote. Timing is the key factor: a site never finishes clean and on time — so we hold a slot within the mason's announced window and shift at no cost if handover slips 24 h.

Market ranges 10/2026 — to confirm with a real quote

nettoyage fin de chantier Agadir rapidenettoyage après travaux Agadir délainettoyage fin de chantier Agadir prixremise en état appartement après travaux Agadir

The two-wave method — why one pass fails

  • Wave 1 (rough debris): vacuum on joinery and blocks, scraping fresh cement, clearing plaster leftovers. Skip it and tomorrow's cloth smears dust everywhere.
  • Wave 2 (final clean): windows and glass doors (a paint fleck on every frame), skirting and ledges, bathrooms and kitchenette, marks on tile.
  • New tile wants neutral cleaner: strong acid eats the grout on the first pass — what rushed 'site pros' get wrong.

Price and timing: when to say yes

  • Flat 80–120 m², two waves: 550–950 MAD, same day if the mason delivers in the morning.
  • Villa 200 m²+ over floors: 1,200–2,500 MAD, often on 2 days with high window work.
  • Get the detail in writing: windows included or not, construction waste removal (usually the mason's), water access.
  • Every range stays to be confirmed (real quote): site photos by WhatsApp are enough to price it.
Price and timing: when to say yes
CaseIndicative rangeTiming
Flat 80–120 m², two waves550–950 MADsame day
Villa 200 m², 2 floors1,200–2,500 MAD1–2 days
High-window add-on150–400 MADnext day if needed
Shift if handover slips0 MADfree 24 h reschedule

Our neighbourhoods in Agadir

Services

Post-ConstructionPost-construction1,200–3,000 MAD / job

Frequently asked questions

How long does post-construction cleaning take?

One day for an 80–120 m² flat in two waves; villa 1–2 days.

What if the site runs late?

Free 24 h reschedule when handover slips: we re-set the window with the mason.

How much does cleaning after works cost?

550–950 MAD for a standard flat (real quote to confirm); high windows are an add-on.

Related articles