Skip to content

Post-construction cleaning price in Agadir (per m²)

Post-construction cleaning in Agadir runs 15–30 MAD per m², i.e. 1,200–3,600 MAD for an 80–120 m² handover apartment, more for new villas or glued and stained finishes. The price is driven by the residues to handle (cement, plaster, glue, paint) and site access. Every figure is a range to validate with a real quote ; scope, surfaces and deadline are written after the visit.

To be confirmed (proper quote) — market 10/2026

Range to validate (real quote) — market consolidation 10/2026.

Post-construction cleaning price in Agadir (per m²)
ServiceRange MAD
Standard new apartment (80–120 m², normal handover)1,200–3,000 MAD / job
New villa (200–350 m²)3,000–9,000 MAD depending on condition
Rough screed and raw tiling (granito)inside the per-m² range
Stuck residues or stubborn stains (second pass)+15–25 % of the invoice
Waste removal (excluding heavy rubble)quote, tip disposal billed

What is included

  • Full wet dust removal on floors, low walls and fittings.
  • Removal of accessible cement, plaster, glue and paint marks.
  • Window and low casement cleaning once protections come off.
  • Evacuation of cleaning waste in closed bags.
  • Photographic handover of each finished room to the site owner.

What is not included

  • Heavy rubble clearing and skip rental.
  • Industrial façade cleaning and marble treatment (separate scope).
  • Repair or renovation of damaged finishes.
  • Work above 4 m high (lift platform to be arranged).
  • Final disinfection (separate protocol, on request).

What moves the price

  • Volume of residues: fresh cement, plaster, glue, splashed paint.
  • Finish type: tiles, marble, glued carpet.
  • Number of passes needed and the deadline required.
  • Access: floor without lift, site without water or power.
  • Handover schedule: cleaning is timed to the delivery date.

Related service page

Post-Construction

Related price sheets

Price FAQ for this service

How much is post-construction cleaning per m² in Agadir?

The market range sits between 15 and 30 MAD per m², i.e. 1,200–3,000 MAD for an 80–120 m² apartment at normal handover. Pending a real quote: stubborn residues and poor access push the range up.

Which residues do you handle?

Cement, plaster, glue, paint and cutting dust, on finishes that tolerate it. The list of treated residues and a before/after photo report are part of the handover file.

Do you cover handovers in Anza or Founty residences?

Yes, on a schedule aligned with delivery and with developer references. The per-m² rate drops when several units share the same slot and logistics.