Plumber prices in Agadir — repair call-outs
A plumbing call-out in Agadir costs roughly 150–500 MAD per intervention (labour only): a leak, a tap, a WC flush or a blocked trap. Replacement parts are billed on top at purchase price, listed on the quote. Night or Sunday call-outs price above the daytime range. Every figure stays to be confirmed (proper quote): the firm price is written after a diagnosis by photos or a visit, with the likely parts list attached — useful when you rent out or manage a Taghazout property remotely.
Range to be confirmed (proper quote) — market consolidation 10/2026, no firm price before diagnosis.
| Service | Range MAD |
|---|---|
| Standard daytime call-out (leak, tap, WC flush) | 150–500 MAD / call-out |
| Simple unblocking of a trap or WC | 150–300 MAD / call-out |
| Finding a leak in a concealed pipe | quote after diagnosis |
| Night or Sunday call-out | above the daytime range |
| Replacement parts (taps, seals, pipes) | billed extra at purchase price |
| Travel from Agadir to Taghazout / Tamraght | add approx. 50–100 MAD |
What is included
- Diagnosis of the problem and a written quote before any part is removed.
- Dismantling, repairing or replacing the faulty part — as labour.
- Reassembly and a water-tightness test carried out in front of you.
- Cleaning the work area and taking away the replaced part.
What is not included
- Replacement parts (seals, taps, pipes), billed at purchase price.
- Chasing or masonry work to reach a pipe buried in a wall or floor.
- Full replacement of a rising main, water heater or bathroom installation.
- Water damage already caused (stained ceiling, lifted tiles): a separate restoration job.
What moves the price
- Time of the call-out: working hours, evening, night, Sunday.
- Accessibility of pipes and fittings (concealed or exposed).
- The parts list and prices identified at diagnosis.
Related service page
Plumbing RepairsRelated price sheets
- Housekeeper160–240 MAD / visit
- Villa caretaker3,500–5,500 MAD / month
- Villa cleaning600–900 MAD / visit
- Post-construction1,200–3,000 MAD / job
- Airbnb concierge150–250 MAD / turnover
- Sofa cleaning200–300 MAD / item
- Office cleaning12–18 MAD / m² / month
- Garden maintenance300–500 MAD / visit
- Electrician (repairs)150–450 MAD / call-out
Price FAQ for this service
What does a plumber cost in Agadir?
150–500 MAD per daytime call-out, labour only, with parts extra at purchase price. The amount stays to be confirmed by a proper quote, written after a diagnosis by photos or a visit.
Do night emergencies cost more?
Yes: night or Sunday call-outs price above the daytime range. The exact rate is announced before the trip, in writing by phone or WhatsApp.
Are parts included in the range?
No: parts (seals, taps, pipes) are billed on top at purchase price, the list written on the quote. The range covers labour only.