Post-construction cleaning in Anza: 180 m² made hand-over ready in one day
Post-construction cleaning is priced by surface: on this typical profile, a recently fitted-out 180 m² unit in Anza is made hand-over ready in one day by 3 operators, on the basis of the published range of 15–30 MAD/m² (/prix/fin-de-chantier/ sheet, source: October 2026 consolidation) — i.e. 2,700–5,400 MAD for this profile, total to be validated by quote.
Mission context
Area: Anza, the industrial and port district north of Agadir, between Tamraght and the corniche — shops, workshops and new residential blocks come off site there constantly.
Property type (typical profile): a retail unit or workshop of about 180 m², recently fitted out: tiled or polished floors, fresh ceilings, new joinery (surfaces to be validated on the plan).
Starting condition: sanding dust on every high surface, protective film and adhesives to peel, cement and plaster residues on the floor, tile glue traces, paint flecks on joinery. The neighbouring site may still be running and throwing dust — the step order accounts for that.
How the job runs
Residue inventory
45 min (to be validated)
Before the first sweep, we list what sits on floors and finishes: cement, plaster, glue, paint, films. Sensitive finishes (marble, polished stone) are identified and protected before anything is removed. The written quote follows this inventory, not a flat grid.
Dry technical dusting
2 h (to be validated)
Ceilings, beams, ducts and high walls are dusted dry, with a shop vacuum then damp cloths. Doing every high surface dry before any wet work stops dust from cementing onto damp floors.
Floors and bonded residues
2 h (to be validated)
Tile glue comes off with a soft scraper, then a single-disc machine fitted with pads matched to the floor; fresh cement haze yields under a specific product given its dwell time; final rinse with clean water, changing the bucket water often.
Glass and joinery
1 h 30 (to be validated)
Films and stickers come off, then foam-resin spots and paint flecks with a product safe on fresh lacquer; glass is washed in and out. On this profile the frontage sits near the corniche, heavily exposed to sand-laden wind — demineralised water only.
Sign-off with the site
30 min (to be validated)
A joint walk-through with the site manager or the owner, point by point against the morning's residue list; photos; a signed hand-over sheet. That document serves the client as delivery proof for insurance and for the lease.
Means deployed
Team
- 3 operators (typical profile): 1 on high surfaces, 1 on floors, 1 on joinery and vacuum
- 1 supervisor for the inventory, the joint sign-off and the hand-over sheet
Equipment
- Industrial shop vacuum (fine debris included)
- Single-disc machine plus pads matched to the floor (stone, marble, concrete)
- Soft scrapers and dissolvers for glue and cement haze
- Stainless blades for films and adhesives
- Water-fed pole and demineralised water for the frontage glass

Expected outcome
On this typical profile, the unit is hand-over ready in one day: floors free of haze and bonded film, ceilings free of sanding dust, joinery free of paint flecks, clear glass (volumes still to be validated on site).
Before/after photo slot: the images shown are archive placeholders. Real photos of this profile (bonded glue floor, stickered glass, final state) will be published after the first validated mission — no simulated site will ever be published.
Reference budget
Reference budget: the /prix/fin-de-chantier/ sheet publishes 15–30 MAD/m² for a full post-works clean, depending on residue types (source: October 2026 consolidation). For 180 m², this profile projects to 2,700–5,400 MAD — total to be validated by written quote.
Durations, surfaces and totals marked “to be validated” will be confirmed after the first real missions. The firm price comes from a written quote after a site visit (via /contact/).
Related price sheet
Related services
Neighbouring area
TalborjtRequest a quote for this mission profile
Post-construction cleaning is priced by surface: on this typical profile, a recently fitted-out 180 m² unit in Anza is made hand-over ready in one day by 3 operators, on the basis of the published range of 15–30 MAD/m² (/prix/fin-de-chantier/ sheet, source: October 2026 consolidation) — i.e. 2,700–5,400 MAD for this profile, total to be validated by quote.
ContactFAQ about this sheet
How much does post-construction cleaning in Anza cost?
The /prix/fin-de-chantier/ sheet publishes 15–30 MAD/m² depending on the residues to treat; for 180 m², the typical profile projects to 2,700–5,400 MAD, total to be validated by quote.
Is rubble removal included?
No. Large construction waste stays with the main contractor or the owner; the cleaning contract only covers the finishing residues listed in the initial inventory.
When should the post-construction clean be scheduled?
After the heavy tools and the dusty trades have left, with no further furniture delivery planned; otherwise the neighbouring site re-deposits dust. The slot is agreed with the site manager for a quiet day.